Electricity and heat production is the key business of RusHydro Group. The Group’s asset structure includes over 90 renewable energy facilities in Russia, along with some thermal power plants and electrical grid assets in the Far East.
As at January 1, 2020, the installed capacity of RusHydro power plants, including Boguchanskaya HPP, totaled 39,683 MW*, up 313 MW* y-o-y. The installed heat capacity increased to 19,021 Gcal/h, up 97.3 Gcal/h.
The growth in the installed capacity of the Group’s facilities was driven also by the commissioning of Nizhne-Bureyskaya HPP (320 MW) and Sakhalinskaya GRES-2 (120 MW) as well as the implementation of the Comprehensive Modernization Program at Saratovskaya HPP (+12 MW), Novosibirskaya HPP (+10 MW), Votkinskaya HPP (+30 MW) and Zhigulevskaya HPP (+10,5 MW).
The installed capacity structure shows the prevalence of large HPPs generating 29,370 MW*, or 74.0% of the total installed capacity, while 8,506 MW, or 21.4% of the installed capacity, is generated by the TPPs of RAO ES East Subgroup. The Group’s assets also include 1,200 MW Zagorskaya PSPP, 300 MW Zelenchukskaya HPP-PSPP and 16 MW Kubanskaya PSPP. The Group’s renewable energy facilities, including SHPP (up to 25 MW), GeoPP, WPP and SPP, account for a total installed capacity of 291 MW.
The businesses of JSC RAO ES East ensure power transmission and distribution both in UES of the East and in isolated energy systems.
As at the end of 2019, the total length of DRSK and PJSC Yakutskenergo transmission power lines in UES East and 35−220 kV isolated energy systems increased by 463 km and reached 35,429 km.
At the end of 2019, the total length of 0.4−10 kV overhead and cable power lines made up 69,592 km, down 190 km y-o-y.
At the end of the reporting period, the total number of transformer substations decreased to 21,953, down 47, with their total capacity hitting 30,514 MVA, up 1,197 MVA. The changes in the length of transmission power lines and in the number and capacity of transformer substations are primarily associated with the housing construction in large cities of the Far East, grid upgrade, and reduction of PJSC Sakhalinenergo grid capacities.
When managed by RusHydro, grid facilities of the Far East, including JSC DRSK, have been demonstrating a robust improvement in both its operating and production performance. Net profit increased from the negative RUB 1 bn in 2012 to RUB 2.7 bn in 2019.
Measures put in place by the Company helped to bring losses down to 7.31% for 2019 (compared to 9.41% in 2007). The target by 2024 is 7.08%, which is considerably below the average across IDGCs that are part of Rosseti Group.
Per unit metrics at JSC DRSK (output per employee of RUB 5,704 thousand per employee and productivity of RUB 3.26 thousand per man-hour) are also significantly above the average Russian levels calculated for IDGCs.
Between 2011 and 2019, JSC DRSK provided utility connections to 92 thousand applicants to the total maximum capacity of 2,716 MW. Since 2016, Far Eastern Hectare, a large-scale program, has been run across the Far Eastern Federal District. As part of the project, JSC DRSK has provided connections to electrical grids for 693 applicants, with another 457 facilities to be connected going forward.
As a result of Yakutskenergo entering the WECM in 2019, RusHydro updated the information on the length of transmission power lines and the number and capacity of transformer substations, provided below.
Length of overhead and underground transmission power lines by regulatory regime*, km [EU4]
Grid class | 2017 | 2018 | 2019 | |||
---|---|---|---|---|---|---|
WECM | REM | WECM | REM | WECM | REM | |
Length of transmission power lines | ||||||
Overhead power lines | ||||||
220 kV | - | 5,179.9 | - | 5,179.9 | 2,041 | 3,241.9 |
110 kV | 7,939.7 | 5,903.7 | 7,975.2 | 5,898 | 10,568.8 | 3,482.5 |
35 kV | 8,806.9 | 6,997.1 | 8,856 | 6,916.5 | 1,2479 | 3,471.9 |
Cable power lines | ||||||
110 kV | 40.1 | 1.6 | 40.1 | 4.7 | 41.2 | 4.6 |
35 kV | 83.5 | 4.0 | 91.6 | 4.0 | 91.6 | 6.1 |
Length of distribution power lines | ||||||
Overhead power lines | ||||||
6 (10) kV | 20,539.6 | 10,957.3 | 20,621.8 | 11,025.4 | 28,035.4 | 3,596.2 |
0.4 kV | 20,531.9 | 11,458.8 | 20,503.1 | 11,677.3 | 28,020.8 | 4,109.2 |
Cable power lines | ||||||
6 (10) kV | 1,155.7 | 2,040.8 | 1,267.9 | 2,085.8 | 1,880.2 | 1,317.2 |
0.4 kV | 1,120.4 | 1,450.7 | 1,119.7 | 1,480.4 | 1,785.6 | 847.2 |
Total | 104,211.7 | 104,747.4 | 105,020.4 |
Number and installed capacity of 6−220 kV transformer substations [EU4]
Metric | Unit | 2017 | 2018 | 2019 | |||
---|---|---|---|---|---|---|---|
WECM | REM | WECM | REM | WECM | REM | ||
Number of 220 kV transformer substations | pcs | 1 | 28 | 1 | 27 | 8 | 24 |
Capacity of 220 kV transformer substations | MVA | 80 | 3,652 | 80 | 3,351 | 1,152 | 3,117 |
Number of 110 kV transformer substations | pcs | 242 | 140 | 246 | 139 | 317 | 73 |
Capacity of 110 kV transformer substations | MVA | 7,371 | 4,496 | 7,667 | 4,694 | 10,119 | 2,596 |
Number of 35 kV transformer substations | pcs | 476 | 383 | 479 | 386 | 656 | 228 |
Capacity of 35 kV transformer substations | MVA | 4,381 | 1,613 | 4,446 | 1,715 | 4,965 | 1,365 |
Number of 6 (10) kV transformer substations | pcs | 10,943 | 9,451 | 11,121 | 9,601 | 16,542 | 4,105 |
Capacity of 6 (10) kV transformer substations | MVA | 3,512 | 3,672 | 3,565 | 3,799 | 5,368 | 1,832 |
Total substations | pcs | 21,664 | 22,000 | 21,953 | |||
Total capacity of substations | MVA | 28,777 | 29,317 | 30,514 |
In 2019, total electricity fed to the grids of the Far Eastern Federal District stood at 35,282 mn kWh, up 145 mn kWh y-o-y. The grid losses amounted to 9.8%, up 0,2% y-o-y. The change in relative losses in 2019 was driven by a different operating environment following PJSC Yakutskenergo’s accession to WECM — large consumers of Yakutia power grid switched to WECM. This resulted in lower electricity inflow in the Western energy hub of the Republic of Sakha (Yakutia) and PJSC Yakutskenergo, while the absolute losses remained flat y-o-y. [EU12]
RusHydro Group regularly implements initiatives to reduce energy losses, including meter testing and replacement, switching to less powerful transformers, installing higher accuracy class equipment, etc.
In 2019, the Group’s power generation, including Boguchanskaya HPP, declined by 1.0% y-on-y and amounted to 142.8 bn kWh. According to the System Operator* of the Unified Energy System, last year saw the growth in Russia’s electricity generation and consumption by 0.9% and 0.4%, respectively. The Group’s electricity generation made up 13.0% of the Russian total power generation.
RusHydro Subgroup’s electricity generation amounted to 108.4 bn kWh, down 1.3% y-o-y due to a less favorable hydrological situation. In 2019, electricity generation at the Subgroup’s Sevan-Hrazdan Cascade HPPs in Armenia grew by 2.9% y-o-y and totaled 0.4 bn kWh.
During the same period, PJSC RAO ES East power plants generated 34.4 bn kWh, down 0.3% y-o-y. The decline was attributable to an increase of generation by PJSC RusHydro HPPs in UES East by 1.2 bn kWh (+10.2%), coupled with a 3.3% total energy consumption increase in the Far Eastern Federal District (to 48.6 bn kWh) and a 0.1 bn kWh decrease in the energy outflow to UES Siberia and China (-2.7%). the heat supply stood at 30.0 mn Gcal.
In 2019, the main factors affecting the Group’s electricity generation and heat supply included:
RusHydro and System Operator of the Unified Energy System have successfully partnered for many years, primarily on ensuring that the country’s energy system continues stable operation. Our constructive business relationship has also become the foundation for joint work on improving the industry’s regulatory framework, developing standardization, and putting in place a youth policy and a number of other activities.
RusHydro employs real professionals whose knowledge, experience, skills, and responsibility help guarantee the reliable and safe operation of existing hydropower plants, as well as the development of hydropower and renewable energy in Russia overall. The RusHydro team’s success is the most crucial factor in ensuring a reliable energy supply to Russian consumers and the country’s sustainable industrial growth.
In 2019, the Group’s businesses were involved in implementing the Target Model for “Utility Connection to Electrical Grids” approved by the Russian Government’s Decree No. 147-r “On target models for simplifying business procedures and enhancing investment appeal of the Russian regions” dated January 31, 2017 (the “Program”).
The project seeks to simplify the procedure for utility connection (the “UC”) for legal entities or sole proprietors requesting the power of up to 150 kW with receiver reliability category 2 and 3 (shorter timing, enabling interaction with the grid company via a personal account without a need to visit the client office). The Group’s participants in the Program comprise JSC DRSK, PJSC Kamchatskenergo, PJSC Sakhalinenergo, PJSC Magadanenergo, JSC Chukotenergo and PJSC Yakutskenergo.
The Program made it possible to introduce an online service to the energy companies' websites featuring personal accounts for the applicant to interact with the grid company and to make preliminary calculations of the UC cost (UC tariff calculator), apply for a UC, receive a UC contract and sign the necessary UC documents, including their electronic versions.
The applications filed by the applicant through the Personal Account differ in their share across regions of the Far Eastern Federal District, with, for example, 1% at JSC Chukotenergo, 22% at JSC DRSK and 48% at PJSC Sakhalinenergo.
Efficient electricity and capacity sales in the wholesale market (WEM) and the growing retail business remain among the Group’s priorities and have a major impact on its financial performance. The Group sells electricity in Russia both in the wholesale electricity and capacity market (first and second price zones of the wholesale market and UES East’s non-price zone) to major consumers and to retail consumers via its retail companies and guaranteed suppliers.
WECM sales
RusHydro directly sells electricity and capacity in the WECM’s first and second price zones.
In 2019, total sales dropped y-o-y following a decline in net electricity supply as a result of lower water inflow to the key reservoirs of Siberian HPPs and to the Volga-Kama cascade reservoirs in 1H 2019.
In 2019, the average weighted DAM (day-ahead market) price was RUB 1,287.3 per MWh (+3.2%) for the European part of Russia and RUB 896.4 per MWh (+0.7%) for Siberia.
Net supply of electricity and capacity by RusHydro in the first and second price zones of WECM
Metric | 2018 | 2019 | 2019/2018, % |
---|---|---|---|
Net supply, mn kWh | 91,684 | 87,313 | -4.8 |
Electricity purchased, mn kWh | 10,116 | 9,716 | -4.0 |
Total electricity sales, mn kWh | 99,093 | 94,436 | -4.7 |
Capacity sales, MW* | 21,423 | 21,716 | 1.4 |
The growth of the DAM price in the first price zone in 2019 (+3.2% y-o-y) was driven by:
The growth of the DAM price in the second price zone in 2019 y-o-y was driven by:
RusHydro’s electricity and capacity sales prices in the first and second price zones of WECM
Metric | 2015 | 2016 | 2017 | 2018 | 2019 | 2019/2018, % |
---|---|---|---|---|---|---|
Weighted average DAM price, RUB/MWh | 1,096 | 1,080 | 1,094 | 1,114 | 1,107 | -0.6 |
1 PZ DAM price, RUB/MWh | 1,207 | 1,267 | 1,224 | 1,285 | 1,298 | 1.0 |
2 PZ DAM price, RUB/MWh | 883 | 793 | 824 | 825 | 774 | -6.2 |
Weighted average KOM price, RUB / MW per month | 127,564 | 139,781 | 580,558 | 783,822 | 725,757 | -7.4 |
1 PZ KOM price, RUB / MW per month | 125,524 | 111,628 | 3,212,516 | 4,312,779 | 2,922,353 | -32.2 |
2 PZ KOM price, RUB / MW per month | 131,696 | 178,724 | 283,873 | 342,675 | 347,730 | 1.5 |
Capacity sales price changes vs 2018 were attributable to the lower surcharge* to KOM prices in the WECM price zones.
In 2019, electricity and capacity sales declined y-o-y due to:
REM sales [EC]
REM sales in the first and second price zones are consolidated within ESC RusHydro Subgroup (JSC ESC RusHydro, PJSC Krasnoyarskenergosbyt, PJSC Ryazanenergosbyt, JSC Chuvashskaya Electricity Sales Company). Electricity is supplied both directly by JSC ESC RusHydro and via its retail subsidiaries acting as guaranteed suppliers in three Russian regions.
In 2019, ESC RusHydro Subgroup supplied electricity to 1,952,167 consumers in the retail market, including 1,892,519 households on direct contracts. The number of contracts remains stable across consumer groups, except for households and utility service providers. These groups demonstrate both positive and negative trends. Individual customers grew in number as households started signing direct contracts with RusHydro’s subsidiaries under Federal Law No. 59-FZ, while consumers among management companies, condominiums and housing associations shrank as disreputable utility service providers were leaving the market and other management companies were taking over their housing stock. Total sendout of electricity by ESC RusHydro Subgroup amounted to 19,445.8 mn kWh in 2019.
Non-price and isolated zones of the Far Eastern Federal District are covered by RAO ES East Subgroup and Bureyskaya and Zeyskaya HPPs.
Electricity tariffs and supply [OS]
Federal Law No. 35-FZ On Electric Power Industry dated March 26, 2003 outlines the basic principles and methods of state regulation in the electric power industry and the regulators' scope of authority. The basic principles and methods of price (tariff) regulation in the electric power industry and the procedure for setting tariffs are set out in the Russian Government’s Resolution No. 1178 On Pricing in the Field of Regulated Prices (Tariffs) for Electric Power dated December 29, 2011.
Tariffs for electricity (capacity) supplies in the WECM are set by the FAS in line with a methodology developed by the Federal Tariff Service (FTS)*.
Number of households and corporates in service in the first and second price zones [EU3]
Consumer | 2017 | 2018 | 2019 |
---|---|---|---|
Manufacturing industry | 2,714 | 2,680 | 2,653 |
Transport and communications | 1,226 | 1,232 | 1,282 |
Agriculture | 2,053 | 2,168 | 2,300 |
State-financed | 7,903 | 7,654 | 6,880 |
Management companies, condominiums, housing associations, etc. | 2,042 | 1,997 | 2,529 |
Wholesalers-resellers | 74 | 83 | 98 |
Housing and utilities | 456 | 456 | 419 |
Heat suppliers | 124 | 132 | 137 |
Other | 41,683 | 42,513 | 43,350 |
Households | 1,779,929 | 1,808,857 | 1,892,519 |
Total | 1,838,204 | 1,867,772* | 1,952,167 |
The primary tariff calculation methodology for generating facilities located in the WECM non-price zone is the one based on indexation. It was approved by FTS Order No. 210-e/1 dated August 28, 2014. The base tariff calculated in 2007 is annually adjusted to factor in the index of changes in semi-fixed costs as determined by the Russian Ministry of Economic Development. The 4.3% deflator index in the 2019 tariff was in line with the PPI (excluding contribution from the energy sector). This methodology is also used for new generating facilities starting from the second year of their operation.
During the first year in the wholesale market, the tariff for generating facilities located in non-price zones is set in line with the guidelines approved by FTS Oder No. 199-e/6 dated September 15, 2006. This methodology determines the economically justified amount of financial resources a company needs to operate at regulated tariffs within a specific regulation period (the return on investments, which is accrued through amortization, is not taken into consideration).
Key WECM tariff drivers in 2019:
REM sales in isolated zones are covered by RusHydro’s subsidiaries which are 100% regulated since there is no free electricity (capacity) market in the region. The REM tariffs for generating facilities operating in isolated zones are set by the regional authorities in charge of tariff regulation based on economically justified expenses approved by FTS Order No. 20- e/2 dated August 6, 2004.
For the purpose of tariff determination in 2019, regulators used the following regulation methods:
Since July 1, 2016, numerical tariff values are no longer set for other consumers in the WECM non-price zone. In accordance with the estimated tariff values determined based on indicative prices, the uniform transmission tariff and the sales surcharge approved by the regulator, the tariff increase in the WECM nonprice zone ranged from 0.46% to 3.24%.
In 2019, the overall increase in average electricity tariffs for consumers in isolated energy hubs of the Far Eastern Federal District amounted to 7.6% y-o-y. The smallest increase was registered by Kamchatskenergo (2.8%), while the largest one (16.0%) was delivered by UESK. Chukotenergo reported a tariff decline by 7.8% due to the exclusion of RUB 1,063.0 mn from the required gross revenue in 2019 used to offset the cost of electricity purchased from Bilibino NPP in 2017.
DGK’s weighted average electricity prices in the wholesale market rose by 9.6% in 2H 2019 over 1H 2019, while its average annual energy prices in 2019 remained flat at 0.028% y-o-y.
The weighted average energy rate for all of the DGK stations was: RUB 1,315.94 per MWh in 1H 2019 and RUB 1,366.11 per MWh in 2H 2019 (an increase of 3.8% in 2H 2019 over 1H 2019).
The key factors behind changes in the DGK electricity tariff rates in 2H 2019 compared to the rates approved for 2H 2018 included:
The average DGK capacity tariff rate was RUB 272,829 / MW per month in 1H 2019 and RUB 294,717 / MW per month in 2H 2019 (an increase of 8% over 1H 2019).
Power transmission tariffs
In 2019, the branches of JSC DRSK (Primorye Power System, Amur Power System, Khabarovsk Power System, and Electric Networks of the Jewish Autonomous Region (ES EAO)) entered into the second year of the second long-term regulation period. During this period (2018- 2022), electricity transmission tariffs for Amur Power System will be regulated using the ROIC method, while tariffs for Primorye Power System, Khabarovsk Power System and Electric Networks of the Jewish Autonomous Region will be set using long-term indexation of required gross revenue.
For South-Yakutsk Power System, 2019 was the first year of the long-term regulation period, with tariffs for 2019- 2023 set using the long-term indexation method.
In 2019, DRSK’s required gross revenue in power transmission rose by 0.9% y-o-y.
Tariff subsidization in the Far East [EU23] [OS]
Federal Laws No. 508-FZ dated December 28, 2016 and No. 129-FZ dated June 30, 2017 On Amendments to the Federal Law On Electric Power Industry introduced a surcharge to the capacity price in the first and second price zones, helping to bring tariffs in the Far East down to the Russian base (average) rate.
These amendments provide for a surcharge to be applied to the capacity price in the WECM price zones, with proceeds from the surcharge transferred to the regional budgets of the Far Eastern Federal District in the form of target non-repayable contributions.
As part of the effort to bring electricity (capacity) prices (tariffs) for the Far Eastern consumers other than households to the base rate, the Government issued Decree No. 2739-r dated December 10, 2018 to set the base electricity (capacity) price (tariff) for 2019 at RUB 4.69 per kWh.
As part of the effort to align prices in the Far East with the Russian base rate, the surcharge amount for 2019 was approved by the Russian Government at RUB 32,076.56 mn.
In 2019, the alignment mechanism was used in five out of nine regions of the Far Eastern Federal District. In all of those regions, the average electricity tariff for consumers was higher than RUB 4.69 per kWh. Tariff reduction does not result in lower revenue, as it is fully offset by government subsidies paid from the budget funds generated by surcharge to the capacity auction rate.
As a result of changes made in tariff regulation, the electricity (capacity) prices (tariffs):
Electricity sales in non-price and isolated zones
In 2019, PJSC DEK, acting as the single purchaser in the non-price zone of the Far East’s wholesale electricity and capacity market, purchased 36.3 bn kWh. Its commercial purchases of electricity and capacity in the WECM amounted to RUB 62.4 bn in 2019. Electricity sales stood at 15.9 bn kWh. DEK’s commercial sales of electricity and capacity in the WECM came in at RUB 28.6 bn in 2019.
On a y-o-y basis, DEK achieved considerable gains in terms of volumes and cost of electricity (capacity) purchases and sales following the integration of the Central and Western energy hubs of the Republic of Sakha (Yakutia) into the UES of East effective from January 1, 2019. In 2019, local guaranteed suppliers Yakutskenergo and Viluyskaya HPP-3, which used to service isolated energy hubs on their own, started selling electricity in the WECM via DEK as the single purchaser. In 2019, Yakutskenergo and Viluyskaya HPP-3 sold 2,988.4 mn kWh and 685.7 mn kWh, respectively, in the WECM via DEK. Transneftenergo increased consumption by 921.0 mn kWh, also contributing to DEK’s higher sales.
DEK’s electricity purchases and sales in the WECM non-price zone
Metric | 2018 | 2019 | 2019/2018, % |
---|---|---|---|
WECM electricity purchases, bn kWh | 31.0 | 36.3 | 17.0 |
Cost of WECM electricity (capacity) purchases, RUB bn | 51.6 | 62.4 | 20.8 |
WECM electricity sales, bn kWh | 11.2 | 15.9 | 42.8 |
Cost of WECM electricity (capacity) sales, RUB bn | 20.2 | 28.6 | 41.7 |
Number of households and corporates in service in non-price and isolated zones of the Far Eastern Federal District [EU3]
Consumer | 2017 | 2018 | 2019 |
---|---|---|---|
Manufacturing industry | 3,494 | 3,230 | 3,274 |
Transport and communications | 2,219 | 2,295 | 2,292 |
Agriculture | 1,725 | 1,712 | 1,783 |
State-financed | 11,969 | 12,142 | 12,274 |
Management companies, condominiums, housing associations, etc | 9,287 | 12,154 | 12,960 |
Wholesalers-resellers | 24 | 28 | 32 |
Housing and utilities | 1,852 | 957 | 1,019 |
Other | 56,616 | 56,592 | 56,843 |
Households | 2,464,149 | 2,478,200 | 2,504,738 |
Total | 2,551,335 | 2,567,310 | 2,595,215 |
In 2019, JSC DGK supplied 21.5 bn kWh in the non-price zone of the Far East’s wholesale electricity (capacity) market. Its commercial sales of electricity and capacity in the WECM amounted to 49.4 bn kWh in 2019.
The volumes of electricity (capacity) supply declined by 4% y-o-y, mainly due to the rising electricity sales volumes by Zeyskaya and Byreyskaya HPPs.
Total sendout of electricity under RAO ES East Subgroup’s retail contracts amounted to 30.1 bn kWh in 2019. In 2019, RAO ES East Subgroup served retail market consumers under 2,595,215 electricity supply contracts, including 2,504,738 households.
RAO ES East Subgroup generates and distributes heat in the Far Eastern Federal District.
Heat is supplied on a centralized basis from thermal power plants and boiler stations operated by energy companies. Some energy companies engage in both heat production and distribution, while others do not go beyond production operations.
Heat sales are fully regulated under the Russian law.
Federal Law No. 190-FZ On Heat Supply dated July 27, 2010 sets out the basic price (tariff) regulation principles for heat supply and the scope of authority of regulators in charge of heat supply price (tariff) regulation. The Russian Government’s Resolution No. 1075 On Pricing in the Field of Heat Supply dated October 22, 2012 outlines the main regulation principles and procedures for calculating and approving heat tariffs.
In the Far East, heat tariffs in 2019 were set using the long-term indexation method in line with the Guidelines for Calculation of Regulated Prices (Tariffs) for Heat Supplies approved by FTS Order No 760-e dated June 13, 2013.
The average tariff in DGK zones of operation rose by 4.4%, with the smallest increase (1.9%) registered by the LuTEK branch in the Primorye Territory and the largest increase (9.4%) recorded by Neryungrinskaya GRES in the Republic of Sakha (Yakutia).
In isolated energy hubs, average consumer tariffs for heat supplies added 4.4%, with the smallest increase (0.2%) reported by Teploenergoservis and the largest increase (9.6%) delivered by JSC UESK. Sakhalinenergo reported an average tariff decline of 0.4% compared to the rate approved for 2018 due to the exclusion of Sakhalinskaya GRES operating costs from the required gross revenue after Sakhalinskaya GRES-2 was commissioned in 2019.
Total sendout of heat under RAO ES East Subgroup’s retail contracts amounted to 23.601.9 mn Gcal in 2019. In 2019, RAO ES East Subgroup served retail market consumers under 886,960 heat supply contracts, including 865,952 households.
Number of households and corporates in service in non-price and isolated zones of the Far Eastern Federal District [EU3]
Consumer | 2017 | 2018 | 2019 |
---|---|---|---|
Manufacturing industry | 445 | 443 | 406 |
Agriculture | 33 | 33 | 30 |
State-financed | 3,493 | 3,378 | 3,293 |
Management companies, condominiums, housing associations, etc. | 2,334 | 2,516 | 2,463 |
Heat suppliers | 7 | 10 | 11 |
Other | 13,926 | 14,164 | 14,805 |
Households | 848,529 | 874,030 | 865,952 |
Total | 868,767 | 894,574 | 886,960 |
Reduction in the accounts receivable is one of RusHydro Group’s top priorities across its footprint.
To prevent receivables from growing any further, RusHydro Group relies on all remedies legally available to it to recover debts and make sure current bills are paid as they fall due.
As at December 31, 2019, RusHydro Group’s receivables from buyers and consumers grew by 0.3% to RUB 65.4 bn.
RusHydro and ESC RusHydro Subgroup sell electricity and/or capacity in the first and second price zones, while RAO ES East Subgroup covers the non-price and isolated zones.
The principal debt owed to RusHydro for electricity and capacity supplies stood at RUB 7.7 bn. Total payments received by RusHydro for electricity and capacity supplies to the wholesale and retail markets amounted to 99.8% in 2019 vs 99.1% in 2018.
Debt reduction in 2019 y-o-y was driven by:
As at December 31, 2019, ESC RusHydro Subgroup’s receivables stood at RUB 9,699.2 mn, thus adding RUB 222 mn, or 2.3%, in 2019 y-o-y. 99.9% at Krasnoyarskenergosbyt (RUB 41,033 mn), 98.1% at Chuvashskaya Electricity Sales Company (RUB 14,160 mn), 99.1% at Ryazanenergosbyt (RUB 12,731 mn), and 99.1% at ESC RusHydro (RUB 6,669 mn).
In 2019, ESC RusHydro Subgroup’s receivables generally saw a decline in current bills and debts overdue for 1 month to 2.5 years and an increase in moratorium debt. The latter was expanded to include 83% of the debt of Concern Tractor Plants (consumer of Chuvashskaya Electricity Sales Company) after its subsidiaries were placed under bankruptcy management, supervision or receivership.
At RAO ES East Subgroup, as at December 31, 2019, total payments received for electricity and heat totaled 98.4%, with receivables of RUB 35,102.7 mn. The company received 99.2% of payments for electricity and 96.7% for heat in retail markets. The receivables for electricity and heat amounted to RUB 15,518.0 mn and RUB 19,584.7 mn, respectively.
RusHydro Group’s retail companies use the following three approaches to improve debt recovery:
Drawing attention to systemic non-payment of energy bills is an effective way to improve payment discipline among households, businesses and public sector.
The prompt payment culture is created through measures encouraging regular and timely payment. Given that utility service providers are among the biggest debtors, these initiatives seek to incentivize those management companies, condominiums and housing associations that fulfil their payment obligations promptly.
Other actions include regular posting of “black lists” of persistent non-payers featuring organizations with the worst payment discipline and the highest debt levels.
With a view to strenghthen the payment discipline and motivate consumers to fulfil their debt obligtions (legal entities), Subgroup ESC RusHydro has been actively participating in the arrangement of the regional stage of the annual federal event “Reliable Partner” for a number of years. The regional stage is meant to encourage the most diligent and responsible consumers, to set a high status for reliable consumers of power resources, as well as to support and to maintain the partnership between suppliers and consumers. The contest winners across Russian regions help to sum up the results of the event, which is arranged annualy on the basis of the Federation Council. [OS]
As part of its efforts to reduce receivables under contracts related to electricity (capacity) sales, RusHydro Group works to enforce debt recovery through court action.
In 2019, RusHydro’s debt recovery actions for non-payments translated into court awards for a total of RUB 1,586.9 mn, including arbitration awards of RUB 693.9 mn. Based on the arbitration awards, 29 writs of execution were issued in 2019 for RUB 1,249 7 mn. Of those, debt outstanding in the amount of RUB 638.105 mn was repaid in the reporting period.
In 2019, ESC RusHydro Subgroup filed 48,704 claims as part of its debt collection efforts to recover debt on electricity bills for a total of RUB 3,706 mn, of which 4,313 claims were against legal entities, including grid companies purchasing electricity to offset grid losses (76 claims of RUB 499.4 mn). Most of the non-payment cases that resulted in court action were in the utilities sector, represented in particular by utility service providers, which had 1,421 claims filed against them; a total of 609 claims were lodged against utilities companies. The combined debt of these two groups came in at RUB 1,381.9 mn. Compared to 2018, the number of claims filed against state-funded organizations dropped two-fold, reflecting improved payment discipline in this consumer group. The Group’s subsidiaries lodged claims with magistrates courts against 44,391 individuals for RUB 252 mn in 2019. Courts of different instances satisfied 43,820 claims for RUB 2,493.7 mn, and issued 40,348 writs of execution for over RUB 2,470 mn. The measures that bailiffs may use for non-payment include direct debiting, freezing injunction, travel restriction, and restriction on disposal (sale, transfer by gift, etc.) of cars and real estate.
In 2019, RAO ES East Subgroup filed 227,571,000 claims to recover debt on electricity and heat bills for a total of RUB 11,454 mn, including 7,419 claims of RUB 7,464 mn against legal entities, of which 1,166 claims of RUB 1,430 mn were against statefunded organizations, and 220,152 claims of RUB 3,990 mn against individuals. Courts of different instances satisfied 204,357 claims for RUB 9,387 mn.
Limitation of electricity and heat consumption for non-payment is an effective measure, but a last resort in ensuring debt recovery.
The procedures of notifying consumers in arrears of any limitations in consumption and actual implementation of the same are in full compliance with applicable laws (Procedure for Consumption Limitations in Circumstances Other Than Power Facility Repairs or (Risk of) Emergency Operating Modes as per the Russian Government’s Decree No. 624 dated May 24, 2017).
Electricity supply can be recovered in full only after the debt is fully settled (or a restructuring agreement is signed), the penalties and reconnection charges are paid.
In 2019,
RAO ES East Subgroup saw a total of 265,069 disconnections for non-payments in 2019, including 259,357 consumers from the Households group.
Comprehensive Modernization Program
As many large HPPs were commissioned in the 1950s and 1960s, the need arose in the early 2000s to upgrade or replace the existing equipment. Tough economic conditions prevented HPPs from replacing obsolete and worn-out equipment and forced it to focus on maintenance and partial replacements instead.
Since mid-2000s, a number of RusHydro’s HPPs began replacing equipment on a case-by-case basis, but the overall trend of ageing prevailed.
This was true until December 2011, when the Board of Directors approved the Comprehensive Modernization Program to upgrade the Company’s power generation facilities by 2025. Its key priority is to ensure that no core generation equipment with expired safe operation life remains in place by then.
In 2019, Votkinskaya HPP’s hydropower unit No. 5 was upgraded as part of RusHydro’s Comprehensive Modernization Program, becoming the third fully modernized hydropower unit at the plant.
Key results of RusHydro’s Comprehensive Modernization Program in 2019
Equipment type and HPP | 2019 | 2020 E |
---|---|---|
Units of equipment replaced or modernized | ||
Turbines | 11 | 6 |
Generators | 9 | 5 |
Transformers | 4 | 7 |
Additions to installed capacity, MW | ||
Zhigulevskaya HPP | 10.5 | 0.0 |
Saratovskaya HPP | 12.0 | 0.0 |
Novosibirskaya HPP | 10.0 | 0.0 |
Votkinskaya HPP | 30.0 | 0.0 |
Cascade of Verkhnevolzhskiye HPPs | 0.0 | 10.0 |
Total installed capacity | 62.5 | 10.0 |
At Volzhskaya HPP, new hydropower units No. 3 and 7 were launched. In addition, the plant saw Russia’s first ever commissioning of unprecedented innovation: a phase angle regulator, designed to support power transmission from Volzhskaya HPP. The phase angle regulator will enable redistribution of output between 200 kV and 500 kV and increase transmission via a 500 kV power line.
Kamskaya HPP celebrated the completion of a turbine upgrade at hydropower units No. 3 and 6, and Saratovskaya HPP had turbines at hydropower units No. 1 and 9 successfully replaced.
At Novosibirskaya HPP, the turbine replacement was followed by commissioning of the hydropower unit No. 2. A new main control board was also put into operation at the plant, boasting the latest digital technologies. The original main control board of Novosibirskaya HPP was commissioned back in 1957 for the plant’s personnel to operate all of the HPP’s equipment. After more than 60 years of operation, the board’s equipment, which had still relied on electro-mechanical switches and relays, became worn-out and obsolete and needed to be replaced. The new board consists of seven sections with a total length of 14 m and two video panels, providing personnel with all the information they require. In addition, a new control desk with automated workplaces was installed and the control room was repaired to replace power supply and HVAC systems.
Cheboksarskaya HPP put into operation hydropower units No. 3 and 11 following their upgrade, which included the recovery of the adjustable blade pitch, the replacement of the iron piece of the rotor rim, tachogenerator and stator of generator No. 3, as well as tachogenerator and stator of generator No. 11. On top of that, obsolete oil circuit breakers of the plant’s 220 kV outdoor switchgear equipment were replaced with the latest gas-insulated ones.
At Rybinskaya HPP, an upgrade of hydropower unit No. 3 was completed, with a turbine and a generator replaced.
RusHydro’s efforts also focused on modernizing electrical equipment at other plants. One example is the commissioning of modern switchgear at Zagorskaya PSPP.
Following the upgrade, the hydropower units underwent the re-labeling procedure to formally document their new capacities. This added 62.5 MW to the capacity of RusHydro Group’s existing HPPs: 30 MW at Votkinskaya HPP, 12 MW at Saratovskaya HPP, 10.5 MW at Zhigulevskaya HPP, and 10 MW at Novosibirskaya HPP.
Rehabilitation and modernization program
The rehabilitation and modernization program of RusHydro’s branches draws upon the Comprehensive Modernization Program and focuses on extending the lifespan of the core generation equipment, reducing production costs and enhancing the overall economic efficiency of hydroelectric power plants.
Driven by the need to ensure long-term reliability throughout its technological complex, JSC RAO ES East Subgroup runs its own rehabilitation and modernization program (as part of its investment program). The development and implementation of this initiative is regulated by RusHydro Group’s Technical Policy.
In 2019, the rehabilitation and modernization program of RAO ES East Subgroup saw completion of several important projects, including:
The Company also paid close attention to the rehabilitation of heat supply networks and the modernization of substations and transmission lines to ensure stable power supply for existing consumers and new customers.
One of RusHydro Group’s strategic goals is to provide a reliable power supply and ensure safe operation of equipment, hydraulic structures, and production facilities. RusHydro’s Technical Policy1 plays a crucial role in this process.*.
The document aims to identify key operations of RusHydro Group suitable for developing and applying technical solutions and technologies designed to boost reliability, safety and efficiency of production facilities in the short and long term.
The Technical Policy comprises a range of mandatory technical solutions enabling planned changes in production facilities in line with laws and regulations in the power industry, goals of RusHydro Group’s Development Strategy, and latest developments in technology.
Key objectives of RusHydro’s Technical Policy are as follows:
RusHydro Group’s Technical Policy defines requirements imposed on the reliability and safety management system for equipment and structures (RSMSES) governed by the Regulations on the Reliability and Safety Management System for Hydraulic Structures and Hydroelectric Power Plants*. As part of the RSMSES, dedicated operating procedures have been put in place for the Analytical Center, one of the key elements in the system assessing the state of equipment and structures, to liaise with the Company’s Headquarters, branches and subsidiaries*.
RusHydro Group’s Technical Policy defines requirements for the integrated process safety management system, including the industrial safety management subsystem.
The following documents were developed and adopted as part of the industrial safety management system:
To oversee preparation of RusHydro’s facilities for special operating conditions and control corrective actions designed to eliminate gaps identified by government, institutional and internal supervisory bodies, the Company has implemented the following information systems:
The Company’s industrial safety priorities are:
Meeting the above industrial safety goals helps reduce industrial risks associated with hazardous production facilities as a result of better process control, quality of repairs and industrial safety audits.
Ways of ensuring reliable and safe facility operation include:
In pursuance of RusHydro’s Decree No. 42r On the Approval of Target Audit Schedule dated February 1, 2019, the Production Unit departments performed target audits of RusHydro’s branches and subsidiaries to improve the effectiveness and control of production process compliance with applicable safety requirements.
The dual control and monitoring of compliance with industrial safety requirements at hazardous production facilities — both internally and externally (by state supervisory bodies) — secures efficient control over safety and reliability of existing assets.
All of RusHydro Group’s production facilities have put in place regulations on in-process monitoring of compliance with industrial safety requirements at hazardous production facilities. RusHydro Group has 517 hazardous production facilities registered in the State Register of Hazardous Production Facilities, including 174 facilities owned by PJSC RusHydro and 343 facilities owned by its subsidiaries.
Allocation of industrial safety responsibilities
Responsible | Functions |
---|---|
Member of the Management Board, First Deputy General Director — Chief Engineer |
|
Industrial and Fire Safety Office of the Industrial and Occupational Safety Department |
|
Directors of RusHydro’s branches and subsidiaries |
|
First Deputy General Directors — Chief Engineers of RusHydro’s branches and subsidiaries |
|
Industrial and occupational safety functions in RusHydro’s branches and subsidiaries |
|
In 2019, RusHydro Group’s accident rate was down 16% y-o-y.
Most accidents (61%) were caused by recurrent natural hazards, third parties not engaged in operations, and animal or bird activity.
System Average Interruption Frequency Index (SAIFI)* [EU28]
Subsidiary | 2017 | 2018 | 2019 |
---|---|---|---|
JSC DRSK | 1.18 | 0.87 | 1.64 |
PJSC Yakutskenergo | 2.34 | 2.97 | 0.10 |
JSC Sakhaenergo | 0.15 | 0.51 | 0.19 |
PJSC Magadanenergo | 1.02 | 0.73 | 1.71 |
PJSC Sakhalinenergo | 5.76 | 2.34 | 2.83 |
PJSC Kamchatskenergo | 2.04 | 1.32 | 1.37 |
JSC UESK | 0.20 | 0.18 | 0.05 |
JSC Chukotenergo | 1.82 | 1.03 | 0.51 |
System Average Interruption Duration Index (SAIDI), h* [EU29]
Subsidiary | 2017 | 2018 | 2019 |
---|---|---|---|
JSC DRSK | 1.34 | 1.08 | 2.04 |
PJSC Yakutskenergo | 4.24 | 6.02 | 0.14 |
JSC Sakhaenergo | 1.67 | 0.57 | 0.34 |
PJSC Magadanenergo | 1.10 | 1.44 | 1.13 |
PJSC Sakhalinenergo | 13.22 | 4.93 | 3.85 |
PJSC Kamchatskenergo | 5.08 | 1.86 | 2.14 |
JSC UESK | 2.14 | 0.36 | 0.94 |
JSC Chukotenergo | 10.14 | 8.16 | 7.45 |
Stable Power Grid Operation in the Sakhalin Region
The electricity system is the backbone of the Sakhalin Region’s economy. Given the island’s isolated location, the electricity system is key to ensuring its sustainable social and economic development, as well as the adequate living conditions for its population.
Its stability is affected by local climatic conditions, including strong cyclonic activity, hurricanes with a speed of up to 56 m/s, high seismicity (magnitude 8−9), aggressive salt deposits, offseason icing of power lines, and frost heave. Coupled with high wear and tear of the grid infrastructure, these factors lead to frequent power failures.
As instructed by the Russian Government’s Decree No. YUTP9−13pr dated March 18, 2016, the Government of the Sakhalin Region and RusHydro Group developed the Program of Stable Power Grid Operation in the Sakhalin Region*.
In 2019, Sakhalinenergo launched a number of initiatives funded from the available sources, including design works at eight facilities and construction and installation works at three facilities.
RusHydro Group is responsible for reliable and uninterrupted operation of its facilities. To this end, a dedicated system was implemented at the Company’s production sites to prevent and respond to natural disasters and emergencies. In particular, efforts are made to prevent process upsets and accidents, and if an interruption occurs, the Company does its best to bring the facility operation back to normal as soon as reasonably possible. Furthermore, employees of RusHydro have regular trainings in civil defense and emergency response.
Key potential sources of natural disasters and industrial emergencies at RusHydro Group’s production facilities:
In RusHydro Group, the following functions and officials are responsible for the protection of population and territories from emergencies:
RusHydro Group prevents and responds to emergencies in full accordance with applicable Russian laws on hydraulic structures and hazardous production facilities. For the purpose of rescue and emergency recovery operations, the Company has established a back-up fund of documentation on RusHydro Group’s hazardous facilities, which is maintained by the government.
All RusHydro Group’s facilities have:
Volunteer emergency response teams, local warning systems and contracts for professional emergency response services have been put in place across RusHydro Group’s facilities operating extremely dangerous and highly dangerous hydraulic structures or hazard class II and class III facilities duly assigned to respective civil defense categories.
To fulfil the requirements of HTS safety legislation, the Company provides for the mandatory insurance of public liability of those who own hazardous facilities, in respect of their harmful impact as a result of emergency (the insurance limit under the mandatory insurance contract on the HTS owner’s public liability is stated by legislation in the amount of RUB 6.5 billion), as well as for the voluntary insurance of public liability, increasing the insurance amount up to RUB 35.5 billion, which corresponds to the public liability insurance level of leading Russian power companies. [OS]
In pursuance of the Order of the Russian Ministry of Energy*, RusHydro Group established a functional subsystem of the National Emergency Management System (NEMS).
The Company’s emergency prevention and response and fire safety commission (the “Commission”) is the supervisory body of the subsystem responsible for the timely situation assessment and decision-making on emergency prevention. The Commission’s annual action plans stipulate efforts to facilitate the safe passage of flood water during the spring and summer period, prepare for the fall and winter peak loads, and secure the stable operation during the fire and storm seasons. The Commission manages and coordinates the operations of standing bodies and management bodies responsible for the day-today operation of the functional subsystem.
Permanent management bodies of the Company’s functional subsystem — the Emergency Management Unit of the Situation Analysis Center’s team specializing in civil defense, emergency prevention and response, and civil defense and emergency engineers at RusHydro’s generating branches and subsidiaries — are responsible for the planning of emergency prevention and response, coordination of emergency prevention and response activities in accordance with laws and regulations of the Russian Federation and internal documents of the Company.
Management bodies responsible for the day-to-day operation of the Company’s functional subsystem — the Emergency Management Unit’s duty shift and duty shifts at RusHydro’s generating branches and subsidiaries — conduct 24/7 situation monitoring at facilities, give warnings of identified equipment failures, and carry out priority emergency prevention activities.
For the purpose of emergency prevention and response, RusHydro put in place resource stockpiles at its branches operating hydraulic structures and a dedicated financial reserve at RusHydro. The dedicated financial reserve for emergencies was established on a centralized basis in the interests of RusHydro’s branches by transferring 1% of the average monthly revenue from electricity and capacity sales. All subsidiaries have established the required financial reserves and resource stockpiles for emergency prevention and response.
Employees are trained in emergency recovery as part of the corporate civil defense and emergency response training program. The list of persons to be trained was made in accordance with Russian laws and regulations.
In line with the schedule for 2019, RusHydro Group conducted:
In 2019, 66 people took training or advanced professional training at training centers and as part of civil defense courses, including one civil defense manager and 22 chairmen and members of emergency prevention and response and fire safety commissions (with nine such members coming from the Headquarters).
A special emphasis in occupational safety is placed on the prevention of injuries among local residents arising from contact with the Group’s facilities.
This issue is primarily covered through mass media (articles published in printed and online media) and school safety lessons on hazardous and harmful health impact of various power installations in the event of exposure within a hazardous distance.
In 2019, there were 16 accidents, including 11 third-party fatalities involving RusHydro Group assets. Of this number, nine fatalities resulted from approaching energized parts of power installations or overhead power lines closer than the minimum approach distance. Another two were due to traffic accidents involving vehicles of the Olekminsky electricity distribution zone (Sakhaenergo) and DRSK’s branch Primorye Power System. The accidents were caused by driving under the influence and a third-party traffic violation, respectively.
Additionally, legal proceedings were launched in connection with injuries at RusHydro Group facilities. There were no legal actions lodged in response to fatalities.